Your request was blocked.

Koollifetv.com | No 1 Australia Afro EntertainmentKoollifetv.com | No 1 Australia Afro Entertainment

Koollifetv.com | No 1 Australia Afro Entertainment

KoollifeTV Your Afro Aussie Entertainment Website. Watch Aussiewood Movies and Music. Download and listen to Nigeria Music and watch Nigeria Movies. Gambian Music and more.

T (1) 408 987 5297
Email: info@koollifetv.com

KoollifeTV Entertainment
Perth WA

  • HOME
  • AUSSIEWOOD
  • AUSTRALIA MUSIC
    • AUSSIE MOVIES
    • AUSSIE MUSIC
  • AFRICAN MOVIES
    • NOLLYWOOD MOVIES
    • GAMBIA MOVIES
    • GAMBIA ARTIST
    • GAMBIA MUSIC
    • GAMBIA MOVIES
    • GAMBIA NEWS
  • AFRICAN MUSIC
    • AFRO
    • DANCE HALL
    • MAKOSA
    • REGGAE
    • R&B
    • HIGHLIFE
    • FUJI
    • AFRICAN JAZZ
  • INSTRUMENTALS
    • BUY AFRO BEATS
    • SELL YOUR BEATS
  • CONTACT US
    • ABOUT US
    • KOOLLIFE FREQUENCY
    • FTA
    • ADVERTISE
    • NEWSLETTER
    • OUR WORKS
    • JOB
  • Home
  • NEWS
  • FG threatens to terminate RCC’s contract over road construction delay
June 5, 2026

Blog

Thursday, 10 October 2024 / Published in NEWS

FG threatens to terminate RCC’s contract over road construction delay

The Federal Government has hinted at the termination of the Reynolds Construction Company Osun-Ogbomosho road contract over an 18-year delay in the completion of the project.

The Minister of Works, David Umahi, disclosed this on Tuesday during a joint inspection of the Lagos-Calabar Coastal Highway, Lagos-Ota Expressway and Lagos-Sagamu road.

He said, “The Osun-Ogbomoso road repair is being done by RCC. The contract has taken too long, equating 18 years and the work is not still completed, so we can terminate the contract with RCC by effluxion of time.”

Speaking on the Lagos-Ibadan Sagamu road, Umahi asserted that the contractors contracted for phase 2 of the road project risked termination for non-completion.

He said, “Two contractors were handed the Lagos-Ibadan Sagamu road, which has phases 1 & 2, Julius Berger has completed their part, but RCC is yet to complete phase 2.

“The contractor (RCC) handling the Sagamu to Ibadan stretch of the Lagos-Ibadan Expressway risks termination of its appointment if it fails to return to the site to complete the remaining three kilometers portion of the project, without further delay.”

Umahi explained that RCC had already been given a seven-day deadline, and a warning letter would follow if the contractor did not comply with the fresh terms of the contract.

Speaking On the Lagos-Abeokuta federal highway which has been in bad shape for over eight years, the minister stated that the Governor of Ogun State had excised out the section of Ogun and had awarded it, adding that work was ongoing in line with the directive of President Bola Tinubu.

The directive stated, “Any state governor that wants to do a road should go ahead.”

Umahi continued, “Now we have 18km that is left and this 18km is being processed for conception but I am happy that I came here by myself because one of the carriageways is very good but the traffic in this place is quite enormous.

“So due to public outcry, we have procured about 7km for palliative work. Though we do not have all the money to do the remaining 11km, we have applied to the Minister of Finance to give us some emergency funds to do the entire 18km for the people to use while we await the due process of construction.”

The minister recommended the use of concrete on the Lagos-Ota road.

Meanwhile, Umahi ordered an immediate evacuation of buried refuse on the runway of the Lagos-Calabar Coastal Highway to give the ongoing road construction an accelerated approach.

Welcome to Koollife TV
Please Subscribe to our website and enjoy all the benefits.

We are the No 1 Australian Afro-Aussie Entertainment.
Subscribe today and get your FREE Advert for your Event, Business or Music Promo.

JOIN OR WATCH AUSSIEWOOD MOVIES

Kind Regards.

Check your inbox or spam folder to confirm your subscription.

  • Tweet

KoollifeTV.com | Best Afro Music Station from Perth

KoollifeTV Your a Promotional Company for your Entertainment. Download and Listen to Australian Music, American Music, Nigerian Music, Ghanaian Music, South Africa Music Gambian Music, Western Music and African Music. Powered by KoollifeMultimedia.com.au

OUR DAILY VISITOR

SEARCH FOR MUSIC || VIDEO || NEWS

CLICK LIKE TO GET OUR LATEST POST

DISCLAIMER

Koollifetv.com do not claim ownership of any of the Songs that we upload and any copyright infringement complaints will be executed immediately! It is our policy to honor all take-down requests! If You Feel Your Rights Are Being Infringed Upon, Read More in details about DMCA Click Here!

AFRO INSTRUMENTAL BEATS ( Register Now And Get More)

LATEST AFRICA MOVIES

https://youtu.be/RFycpVPNIwk

LATEST MUSIC VIDEO

https://youtu.be/7RfiyRO-2F8
  • HOME
  • ABOUT
  • FTA
  • CONTACT US
  • ADVERTISE
  • PRIVACY & POLICY
  • TERMS & CONDITIONS

© 2008 - 2023 KOOLLIFETV | All rights reserved KOOLLIFE ENTERTAINMENT.

TOP

WhatsApp us

  • Sinner
  • Adekunle Gold
  • https://koollifetv.com/wp-content/uploads/2021/07/Adekunle-Sinner-artwork-1024x1024-1.png
  • Afro Mixtape;Afro Music
  • https://koollifetv.com/wp-content/uploads/dlm_uploads/2021/07/Adekunle-Gold-Sinner-koollifetv-com_mixdown.mp3
  • Hustle
  • Teni
  • https://koollifetv.com/wp-content/uploads/2021/07/KoollifeTV-Teni-Hustle-artwork-scaled-1.jpeg
  • Afro Mixtape;Afro Music
  • https://koollifetv.com/wp-content/uploads/dlm_uploads/2021/07/Teni-–-Hustle-koollifetv-com_mixdown.mp3
  • Testimony
  • Buju
  • https://koollifetv.com/wp-content/uploads/2021/07/Buju-Testimony-Koollifetv.jpg
  • Afro Mixtape;Afro Music
  • https://koollifetv.com/wp-content/uploads/2021/07/Buju-Testimony-koollifetv-com_mixdown.mp3
  •  Reason With Me (Cover) RudeBoy
  • Rita Ange Kagaju
  • https://koollifetv.com/wp-content/uploads/2020/01/Rita-Ange-Kagaju-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2020/01/Reason-With-Me-Rudeboy-Cover-by-Rita-Ange-Kagaju-koollifetv-com_mixdown.mp3
  • Black People
  • Stonebwoy
  • https://koollifetv.com/wp-content/uploads/2020/01/stonebwoy-black-people-koollifetv.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2020/01/Stonebwoy-Black-People-pod.-By-Oneness-Recordskoollifetv-com_mixdown.mp3
  • Omo Rapala
  • Niniola
  • https://koollifetv.com/wp-content/uploads/2020/01/Niniola-–-Omo-Rapala-700x700.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2020/01/Niniola-Omo-Rapala-koollifetv-com_mixdown.mp3
  • Secrets
  • Burnaboy
  • https://koollifetv.com/wp-content/uploads/2020/01/burnaboy-secret.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2020/01/Burna-Boy-Secret-feat.-Jeremih-Serani-koollifetv-com_mixdown.mp3
  • We Plenti
  • Cobhams Asuquo ft SIMI
  • https://koollifetv.com/wp-content/uploads/2020/01/Cobhams-X-Simi.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2020/01/Cobhams-Asuquo-ft-SIMI-–-We-Plenti-koollifetv-com_mixdown.mp3
  • Billionaire
  • Teni
  • https://koollifetv.com/wp-content/uploads/2020/01/2e6f7132-teni-billionaire-music-video.jpg
  • Teni – Billionaire
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2020/01/Teni-–-Billionaire-koollifetv-com_mixdown.mp3
  • Reason With Me
  • RudeBoy
  • https://koollifetv.com/wp-content/uploads/2019/04/Rudeboy-reason-with-me.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Rudeboy-Reason-With-Me-koollifetv-com_mixdown.mp3
  • Skeletun
  • Tekno
  • https://koollifetv.com/wp-content/uploads/2020/01/Tekno_-_Skeletun_Prod_by_Phantom-2.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2020/01/Tekno-Skeletun-koollifetv-com_mixdown-1.mp3
  • 2020
  • Simbi
  • https://koollifetv.com/wp-content/uploads/2020/01/WhatsApp-Image-2020-01-03-at-11.45.51-AM.jpeg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2020/01/Simbi-Star-2020-koollifetv-com_mixdown.mp3
  • Better
  • Tekno
  • https://koollifetv.com/wp-content/uploads/2020/01/Tekno-–-Better-Hope-For-Africa.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2020/01/Tekno-Better-koollifetv-com_mixdown.mp3
  • Hustle
  • Praiz Ft StoneBoy
  • https://koollifetv.com/wp-content/uploads/2019/05/Praiz-Hustle-Official-Video-Ft.-Stonebwoy.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/05/Praiz-Hustle-Official-Video-Ft.-Stonebwoy-koollifetv-com_mixdown.mp3
  • One more night
  • Mr P ft Ninola
  • https://koollifetv.com/wp-content/uploads/2019/04/Mr-P-One-More-Night.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Mr.-P-One-More-Night-koollifetv-com_mixdown.mp3
  • Fuck You
  • Kizz Daniel
  • https://koollifetv.com/wp-content/uploads/2019/04/maxresdefault-11.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Kizz-Daniel-Fvck-You-koollifetv-com_mixdown.mp3
  • Mr-Vendor
  • Korede-Bello
  • https://koollifetv.com/wp-content/uploads/2019/04/Mr-Vendor.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Korede-Bello-Mr-Vendor-koollifetv-com_mixdown.mp3
  • Iron Man
  • Rema
  • https://koollifetv.com/wp-content/uploads/2019/04/maxresdefault-1.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Rema-Iron-Man-koollifetv-com_mixdown.mp3
  • Mind Your Business
  • Simi Ft Falz
  • https://koollifetv.com/wp-content/uploads/2019/04/Screenshot_2019-04-18-08-24-54.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Simi-koollifetv-com_mixdown.mp3
  • Ori
  • Broda Shaggi
  • https://koollifetv.com/wp-content/uploads/2019/04/Broda-Shaggi-Ori-1.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Broda-Shaggi-Ori-1.jpg
  • On Me
  • Terri
  • https://koollifetv.com/wp-content/uploads/2019/04/download-mp3-Terri-On-Me-mp3-download.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Terri-On-Me-koollifetv-com_mixdown.mp3
  • DESIGNER
  • NINIOLA-FT-SARZ
  • https://koollifetv.com/wp-content/uploads/2019/04/auto-draft_LOADEDWIDE.COM_-24.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/NINIOLA-FT-SARZ-DESIGNER-koollifetv-com_mixdown.mp3
  • Abena
  • Cuppy
  • https://koollifetv.com/wp-content/uploads/2019/04/maxresdefault-50-1280x640.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Cuppy-Abena-Ft.-Kwesi-Arthur-Shaydee-Ceeza-Milli-koollifetv-com_mixdown.mp3
  • Aminah
  • Krizbeatz ft. Reekado Banks, Rayvanny
  • https://koollifetv.com/wp-content/uploads/2019/04/maxresdefault.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Krizbeatz-Aminah-ft.-Reekado-Banks-Rayvanny-koollifetv-com_mixdown.mp3
  • Sensima
  • Skiibii
  • https://koollifetv.com/wp-content/uploads/2019/04/Skiibii-Sensima-Artwork.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Skiibii-Sensima-ft.-Reekado-Banks-koollifetv-com_mixdown.mp3
  • Poko
  • Kizz-Daniel
  • https://koollifetv.com/wp-content/uploads/2019/04/Kizz-Daniel-Poko-Video.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Kizz-Daniel-Poko-koollifetv-com_mixdown.mp3
  • AZAMAN
  • Simicase
  • https://koollifetv.com/wp-content/uploads/2019/04/maxresdefault-2.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/AZAMAN-koollifetv-com_mixdown.mp3
  • On You
  • Tekno
  • https://koollifetv.com/wp-content/uploads/2018/12/Tekno-On-You-OkayNG-600x460.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/12/Tekno-On-You-koollifetv-com_mixdown.mp3
  • Tire
  • Mayorkun
  • https://koollifetv.com/wp-content/uploads/2019/04/Mayorkun-Tire-800x420.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Mayorkun-Tire-koollifetv-com_mixdown.mp3
  • Oya
  • 2Baba
  • https://koollifetv.com/wp-content/uploads/2019/04/oya-come-740x431.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/2Baba-Oya-koollifetv-com_mixdown.mp3
  • Yagi
  • Yemi-Alade
  • https://koollifetv.com/wp-content/uploads/2019/04/YAJI-VIDEO.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Yemi-Alade-Yaji-ft.-Slimcase-Brainee-koollifetv-com_mixdown.mp3
  • Bushman
  • Dr-Dolor-Slimcase-Broda-Shaggi
  • https://koollifetv.com/wp-content/uploads/2019/04/Dr-Dolor-Bushman.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Dr-Dolor-Slimcase-Broda-Shaggi-Bushman-koollifetv-com_mixdown.mp3
  • Woman
  • Tekno
  • https://koollifetv.com/wp-content/uploads/2019/01/Tekno-Woman.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/01/111-Tekno-Woman-Official-Audio-YouTube.mp3
  • Wonder Woman
  • Davido
  • https://koollifetv.com/wp-content/uploads/2018/12/davido-wonder-woman.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/12/Davido-Wonder-Woman-_-koollifetv-com_mixdown.mp3
  • Chizoba | Rudeboy
  • Rudeboy
  • https://koollifetv.com/wp-content/uploads/2018/11/Rudeboy-–-Chizoba.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/11/Rudeboy-Chizoba_koollifetv-com_mixdown.mp3
  • DJ-Spinall-Omoge-Official-Video-ft.-Dotman
  • DJ-Spinall-Omoge-Official-Video-ft.-Dotman
  • https://koollifetv.com/wp-content/uploads/2018/11/omoge-Dj-Spinall.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/11/DJ-Spinall-Omoge-Official-Video-ft.-Dotman-_koollifetv-com_mixdown.mp3
  • On the Low
  • Burna Boy
  • https://koollifetv.com/wp-content/uploads/2018/11/Official-Video-Burna-Boy-–-On-The-Low.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/11/Burna-Boy-On-The-Low__koollifetv-com_mixdown.mp3
  • Intro Ft Mum
  • Mayorkun
  • https://koollifetv.com/wp-content/uploads/2018/11/Mayorkun-The-Mayor-Of-Lagos-Full-Album-Stream.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/11/Intro-Feelings-feat.-Mum__koollifetv-com_mixdown.mp3
  • Something for Something
  • Dbanj ft Cassper Nyovest
  • https://koollifetv.com/wp-content/uploads/2018/11/DBanj-Something-for-Something.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/11/DBanj-Something-for-Something-feat.-Cassper-Nyovest-_koollifetv-com_mixdown.mp3
  • oh oh oh
  • Burna Boy
  • https://koollifetv.com/wp-content/uploads/2018/11/Runtown-Oh-Oh-Oh-Lucie.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/11/Runtown-Oh-Oh-Oh-Lucie_koollifetv-com_mixdown.mp3
  • Zombie
  • Mr P Ft Simi
  • https://koollifetv.com/wp-content/uploads/2018/11/Mr-P-Zombie.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/11/Mr.-P-Zombie-ft.-Simi-koollifetv-com_mixdown.mp3
  • One
  • Tiwa
  • https://koollifetv.com/wp-content/uploads/2018/11/tiwa-one-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/11/Tiwa-Savage-One_koollifetv-com_mixdown.mp3
  • Shake it
  • D'Banj - (feat. Tiwa Savage)
  • https://koollifetv.com/wp-content/uploads/2018/11/DBanj-Shake-It-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/11/DBanj-Shake-It-feat.-Tiwa-Savage_koollifetv-com_mixdown.mp3
  • Osale
  • Zlatan x Davido
  • https://koollifetv.com/wp-content/uploads/2018/11/koollifetv.com-Zlatan-x-Davido.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/11/Zlatan-Ibile-Ft.-Davido-–-Osanle-»-Koollifetv.com-mp3-download.mp3
  • GBONO
  • Burna Boy
  • https://koollifetv.com/wp-content/uploads/2018/09/burnaboy-gbona-koollifetv.com_.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Burna-Boy-Gbona_koollifetv-com_mixdown.mp3
  • E-Better
  • B-Red-FT-Don-Jazzy
  • https://koollifetv.com/wp-content/uploads/2019/04/maxresdefault-3.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/B-Red-FT-Don-Jazzy-E-Better-koollifetv-com_mixdown.mp3
  • shakeam
  • Teni
  • https://koollifetv.com/wp-content/uploads/2018/10/teni-shakeam-artwork.jpeg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/10/Teni-Shakeam-koollifetv-com_mixdown.mp3
  • They Didn't Caught Me
  • Kolaboy x Harrysong
  • https://koollifetv.com/wp-content/uploads/2018/11/Kolaboy_Ft_Harrysong_-_They_Didn_t_Caught_Me_Remix-mp3-image.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/11/Kolaboy-x-Harrysong-They-Didnt-Caught-Me-Remix_koollifetv-com_mixdown.mp3
  • Currency
  • Skales ft Davido
  • https://koollifetv.com/wp-content/uploads/2018/11/Skales-Currency.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/11/Skales-Davido-Currency-_koollifetv-com_mixdown.mp3
  • One Ticket
  • Kizz Daniel ft Davido
  • https://koollifetv.com/wp-content/uploads/2018/11/kiss-daniel-davido-cameroon-620x400.jpeg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/10/Kizz-Daniel-Davido-One-Ticket-_koollifetv-com_mixdown.mp3
  • Case
  • Teni
  • https://koollifetv.com/wp-content/uploads/2018/10/Teni-Case-mp3-image.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/10/Teni-Shakeam-koollifetv-com_mixdown.mp3
  • running-after-u
  • Banky W feat. Nonso Amadi
  • https://koollifetv.com/wp-content/uploads/2018/09/banky-w-ft-nonso-amadi-running-after-u-video.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Banky-W-feat.-Nonso-Amadi-_Running-After-U_koollifetv-com_mixdown.mp3
  • Crazy Love
  • Flavor ft Yemi Alade
  • https://koollifetv.com/wp-content/uploads/2018/11/Crazy-Love.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/10/Flavour-Crazy-Love-Feat.-Yemi-Alade-_-koollifetv-com_mixdown.mp3
  • Together-
  • Rudeboy-patoranking
  • https://koollifetv.com/wp-content/uploads/2018/09/rudeboy-together-ft-patoranking-koollifetv.com_.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Rudeboy-Together-Official-Audio-ft.-Patoranking_koollifetv-com_mixdown.mp3
  • -Master-Groove
  • WizKid
  • https://koollifetv.com/wp-content/uploads/2018/10/Master-Groove-Single-Koollifetv.com_.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/10/WizKid-Master-Groove-_koollifetv-com_mixdown.mp3
  • Bá’núsọ
  • Brymo
  • https://koollifetv.com/wp-content/uploads/2018/09/brymo-1.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Brymo-Bá’núsọ-koollifetv-com_mixdown.mp3
  • -Champion
  • Korede-Bello
  • https://koollifetv.com/wp-content/uploads/2018/10/korde-koolifetv.com_.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/10/Korede-Bello-Champion_koollifetv-com_mixdown.mp3
  • Fever
  • WizKid
  • https://koollifetv.com/wp-content/uploads/2018/10/Master-Groove-Single-Koollifetv.com_.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/10/WizKid-Fever-_koollifetv-com_mixdown.mp3
  • Baecation
  • Dbanj-x-2Baba
  • https://koollifetv.com/wp-content/uploads/2019/04/Screenshot-2019-02-08-at-11.43.00.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Dbanj-x-2Baba-Baecation-koollifetv-com_mixdown.mp3
  • Bless-Me
  • Korede-Bello
  • https://koollifetv.com/wp-content/uploads/2018/10/korde-koolifetv.com_.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/10/Korede-Bello-Bless-Me-koollifetv-com_mixdown.mp3
  • Criteria
  • Olamide
  • https://koollifetv.com/wp-content/uploads/2018/09/olamide-1-500x336.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Olamide-Criteria-koollifetv-com_mixdown.mp3
  • Hangover
  • DEEKAY - FT DAVIDO
  • https://koollifetv.com/wp-content/uploads/2018/10/DeekayDavido-Hangover.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/10/DEEKAY-HANGOVER-FT-DAVIDO-PERUZZI_koollifetv-com_mixdown.mp3
  • SAVE
  • DIJA
  • https://koollifetv.com/wp-content/uploads/2018/09/video-premiere-dija-save-me.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/DiJa-Save-Me-_koollifetv-com_mixdown.mp3
  • Trigger Me
  • Solidstar
  • https://koollifetv.com/wp-content/uploads/2018/09/solidstar.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Solidstar-Trigger-me-Official-Audio-ft.-Mr-Eazi.mp3
  • Choko
  • Tekno
  • https://koollifetv.com/wp-content/uploads/2018/09/new-music-tekno-choko-prod-krizbeatz.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Tekno-Choko-koollifetv-com_mixdown.mp3
  • Fantasy
  • Mayorkun
  • https://koollifetv.com/wp-content/uploads/2018/09/mayorkun-fantasy-700x336.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Mayorkun-Fantasy-koollifetv-com_mixdown.mp3
  • Blessing on me
  • REEKADO
  • https://koollifetv.com/wp-content/uploads/2018/09/Reekado-Banks-Blessings-On-Me-700x700.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Reekado-Banks-Blessings-On-Me-Official-Audio-.mp3
  • Psycho
  • Kcee ft Wizkid
  • https://koollifetv.com/wp-content/uploads/2018/09/Psycho.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Kcee-Psycho-Official-Video-ft.-WizKid-koollifetv-com_mixdown.mp3
  • Iwa
  • Phyno ft Tekno
  • https://koollifetv.com/wp-content/uploads/2018/10/Phyno-ft-Tekno-–-Iwa-koollifetv.com_.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/10/Phyno-IWA-ft.-Tekno_koollifetv-com_mixdown.mp3
  • BANA
  • NINIOLA
  • https://koollifetv.com/wp-content/uploads/2018/09/NINIOLA-BANA.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/NINIOLA-BANA-EXPLICIT-koollifetv-com_mixdown.mp3
  • Tekero
  • Harrysong
  • https://koollifetv.com/wp-content/uploads/2018/09/tekero-1-597x336.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Harrysong-Tekero-_-koollifetv-com_mixdown.mp3
  • Amaka
  • 2Baba ft-Perruzi
  • https://koollifetv.com/wp-content/uploads/2018/09/2Baba-Amaka-ft-Perruzi-500x431.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/2Baba-Amaka-koollifetv-com_mixdown.mp3
  • Bam-Bam
  • Timaya
  • https://koollifetv.com/wp-content/uploads/2018/09/Timaya-Bam-Bam-ft-Olamide.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Timaya-Bam-Bam-feat.-Olamide-koollifetv-com_mixdown.mp3
  • Teyamo
  • Singah
  • https://koollifetv.com/wp-content/uploads/2018/09/Singah.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Singah-Teyamo-_koollifetv-com_mixdown.mp3
  • Solidstar-Shawarma
  • Solidstar-Shawarma
  • https://koollifetv.com/wp-content/uploads/2018/09/solid-star-sharwama.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Solidstar-Shawarma_koollifetv-com_mixdown.mp3
  • Yemi-Alade-Elele
  • Yemi-Alade-Elele
  • https://koollifetv.com/wp-content/uploads/2018/09/Yemi-Alade-Elele-700x700.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Yemi-Alade-Elele-_koollifetv-com_mixdown.mp3
  • Magun
  • NINIOLA FT BUSISWA
  • https://koollifetv.com/wp-content/uploads/2018/09/Niniola-Magun-Remix-feat-Busiswa-Prod-by-SARZ-720x720-720x431.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/NINIOLA-FT-BUSISWA-MAGUN-REMIX_koollifetv-com_mixdown.mp3
  • Unleash
  • Runtown
  • https://koollifetv.com/wp-content/uploads/2018/09/Runtown-Unleash-ft-Frekky.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Runtown-Unleash-_koollifetv-com_mixdown.mp3
  • BioBio
  • Reekado Banks Ft Duncan Mighty
  • https://koollifetv.com/wp-content/uploads/2018/09/Reekado-Banks-Ft-Duncan-Mighty.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Reekado-Banks-Ft-Duncan-Mighty-Bio-Bio-_koollifetv-com_mixdown.mp3
  • Currency
  • Cuppy Ft LAX
  • https://koollifetv.com/wp-content/uploads/2018/09/Curremcy.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Cuppy-Ft-LAX-Currency-Official-Music-Video-_koollifetv-com_mixdown.mp3
  • Damn Delilah
  • Adekunle Gold
  • https://koollifetv.com/wp-content/uploads/2018/09/Adekunle-Gold-Damn-Delilah.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Adekunle-Gold-Damn-Delilah_koollifetv-com_mixdown.mp3
  • Nwa Baby
  • Davido
  • https://koollifetv.com/wp-content/uploads/2018/09/Screen-Shot-2018-07-26-at-14.29.25.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Davido-Nwa-Baby_koollifetv-com_mixdown.mp3
  • do-like-this
  • DJ-CONSEQUENCE
  • https://koollifetv.com/wp-content/uploads/2018/09/do-like-this-video-naijaexclusive.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/DJ-Consequence-Do-Like-This-Ft.-Tiwa-Savage-Mystro_koollifetv-com_mixdown.mp3
  • BLOW THE WHISTLE
  • DJ-CONSEQUENCE
  • https://koollifetv.com/wp-content/uploads/2018/09/do-like-this-video-naijaexclusive.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/DJ-CONSEQUENCE-FT-MAYORKUN_koollifetv-com_mixdown.mp3
  • Wait
  • DJ Neptune ft Kizz Daniel
  • https://koollifetv.com/wp-content/uploads/2018/09/DJ-Neptune-topnaija.ng_.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/DJ-Neptune-Wait-Official-ft-Kizz-Daniel-_koollifetv-com_mixdown.mp3
  • KPA
  • Dremo ft Davido
  • https://koollifetv.com/wp-content/uploads/2018/09/Davido-Nwa-Baby-Artwork-1.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Dremo-KPA-ft-Davido_koollifetv-com_mixdown.mp3
  • Halleluya
  • Johnny-Drille--ft-Simi
  • https://koollifetv.com/wp-content/uploads/2018/09/Johnny-Drille-Halleluya-ft.-simi.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Johnny-Drille-Halleluya-ft-Simi_koollifetv-com_mixdown.mp3
  • Man-Must-Chop
  • Ichaba x Davido
  • https://koollifetv.com/wp-content/uploads/2018/09/Ichaba-Ft.-Davido-–-Man-Must-Chop.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Ichaba-x-Davido-Man-Must-Chop_koollifetv-com_mixdown.mp3
  • Thunder
  • Kidi
  • https://koollifetv.com/wp-content/uploads/2018/09/Kidi-Thunder.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/KiDi-Thunder-_koollifetv-com_mixdown.mp3
  • Commando
  • MUT4Y X WIZKID X CEEZA MILLI
  • https://koollifetv.com/wp-content/uploads/2018/09/Wizkid-Mut4y-Ceeza-Commando-720x720.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/MUT4Y-X-WIZKID-X-CEEZA-MILLI-COMMANDO-OFFICIAL-VIDEO_koollifetv-com_mixdown.mp3
  • POSH
  • MAYORKUN
  • https://koollifetv.com/wp-content/uploads/2018/09/mTORKUN-POSH.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/MAYORKUN-POSH-_koollifetv-com_mixdown.mp3
  • Do-Like-This-
  • DJ-Consequence Ft Tiwa-Savage
  • https://koollifetv.com/wp-content/uploads/2018/09/do-like-this-video-naijaexclusive.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/DJ-Consequence-Do-Like-This-Ft.-Tiwa-Savage-Mystro_koollifetv-com_mixdown.mp3
  • WOKIE WOKIE
  • Mr P
  • https://koollifetv.com/wp-content/uploads/2018/09/Mr-P-WOKIE-WOKIE.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Mr-P-WOKIE-WOKIE-Official-Video-ft-Nyanda_koollifetv-com_mixdown.mp3
  • Skepta-WizKid-Energy
  • Skepta-WizKid-Energy
  • https://koollifetv.com/wp-content/uploads/2018/09/wizkid-skepta.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Skepta-WizKid-Energy-_koollifetv-com_mixdown.mp3
  • -Bia
  • Terri
  • https://koollifetv.com/wp-content/uploads/2018/09/maxresdefault.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Terri-Bia-Audio-koollifetv-com_mixdown.mp3
  • Mr-Real-Legbegbe-Remix
  • Mr-Real-Legbegbe-Remix
  • https://koollifetv.com/wp-content/uploads/2018/09/Mr-Real-Legbegbe-Remix-Artwork.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Mr-Real-Legbegbe-Remix-ft.-DJ-Maphorisa-Niniola-Vista-DJ-Catzico_koollifetv-com_mixdown.mp3
  • Maleek-Berry-Gimme-Life
  • Maleek-Berry-Gimme-Life
  • https://koollifetv.com/wp-content/uploads/2018/09/GimmeLife_MB-720x431.jpeg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Maleek-Berry-Gimme-Life_koollifetv-com_mixdown.mp3
  • WETIN-WE-GAIN
  • VICTOR-AD
  • https://koollifetv.com/wp-content/uploads/2018/09/Victor-AD-Wetin-we-Gain-instrumental.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/VICTOR-AD-WETIN-WE-GAIN-_koollifetv-com_mixdown-1.mp3
  • Bella
  • MHD - Bella (feat. WizKid)
  • https://koollifetv.com/wp-content/uploads/2018/09/maxresdefault-4.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/MHD-Bella-feat.-WizKid_koollifetv-com_mixdown.mp3
  • Tiwa-Savage-Ft-Duncan-Mighty
  • Tiwa-Savage-Ft-Duncan-Mighty
  • https://koollifetv.com/wp-content/uploads/2018/09/Maleek-Berry-Love-U-Long-Time-ft-Chip.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Tiwa-Savage-Ft-Duncan-Mighty-Lova-Lova-_koollifetv-com_mixdown.mp3
  • NINIOLA
  • SICKER
  • https://koollifetv.com/wp-content/uploads/2018/09/niniola.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/NINIOLA-SICKER_koollifetv-com_mixdown.mp3
  • Mushin
  • Terry-Apala
  • https://koollifetv.com/wp-content/uploads/2018/09/apala.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Terry-Apala-Mushin__koollifetv-com_mixdown.mp3
  • One Hit
  • Cobhams Asuquo
  • https://koollifetv.com/wp-content/uploads/2018/05/Cobhams-Asuquo-One-Hit-Koollifetv-1.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/05/Cobhams-Asuquo-One-Hit-Koollifetv.com-Best-Afro-2018.mp3
  • 2geda
  • Korede Bello
  • https://koollifetv.com/wp-content/uploads/2018/05/Korede-Bello-2geda-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/05/Korede-Bello-2geda-koollifetv-com_mixdown.mp3
  • Topic
  • Selebobo
  • https://koollifetv.com/wp-content/uploads/2018/03/Selebobo-Topic-ART-Koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/Selebobo-Topic-Koollifetv.com_.mp3
  • Gucci Snake
  • Wizkid Slimcase
  • https://koollifetv.com/wp-content/uploads/2018/11/Wizkid-Gucci-Snake-koollifetv.com_.jpeg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/11/Gucci-Snake-Audio-feat.-Wizkid-Slimcase_koollifetv-com_mixdown.mp3
  • Tiwas Vibe
  • Tiwa-Savage
  • https://koollifetv.com/wp-content/uploads/2018/05/Tiwa-Savage-All-Over-video-720x405-1-2.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/05/Tiwa-Savage-Tiwas-Vibe-Koollifetv.com_-1.mp3
  • Fake Love
  • Wizkid Ft Dunca Mighty
  • https://koollifetv.com/wp-content/uploads/2018/05/fake-love-wizkid-and-Davido-Chioma-Fake-love-davido-koollifetv.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/05/StarBoy-Fake-Love-Official-Audio-ft.-Duncan-Mighty-Koollifetv.com_.mp3
  • Labalaba
  • Tiwa Savage
  • https://koollifetv.com/wp-content/uploads/2018/05/Tiwa_Savage_Labalaba-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/05/Tiwa-Savage-Labalaba-koollifetv-com_mixdown.mp3
  • Assurance
  • Davido
  • https://koollifetv.com/wp-content/uploads/2018/05/davido-thisday.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/05/Davido-Assurance-Koollifetv.com_.mp3
  • Jogodo
  • Tekno
  • https://koollifetv.com/wp-content/uploads/2018/04/Tekno-Jogodo-Koollifetv.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/04/Tekno-Jogodo-Koollifetv.com_.mp3
  • Askamaya
  • Teni
  • https://koollifetv.com/wp-content/uploads/2018/05/Teni-Askamaya-prod-Spellz-mp3-image-1.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/05/Teni-Askamaya-Koollifetv.com_-1.mp3
  • Yur-Luv
  • Tekno
  • https://koollifetv.com/wp-content/uploads/2018/03/Tekno-Yur-Luv-Latest-Afro-Music-Koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/Tekno-Yur-Luv-Latest-Afro-koollifetv.com_.mp3
  • BOBO
  • Mayorkun-Davido
  • https://koollifetv.com/wp-content/uploads/2018/03/Mayorkun-Davido-BOBO-Koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/Mayorkun-feat.-Davido-BOBO-Koollifetv.com_.mp3
  • Action
  • D’Banj
  • https://koollifetv.com/wp-content/uploads/2018/05/DBanj-Action-Video.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/05/D’Banj-Action-Koollifetv.com_.mp3
  • Easy Jeje || Reekado Banks
  • Reekado Banks
  • https://koollifetv.com/wp-content/uploads/2018/01/Reekado-Banks-Easy-Jeje-Koollifetv.com_.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Reekado-Banks-Easy-Jeje-MP3-Official-Music-Audio-Video-Koollifetv.com1_.mp3
  • AJE
  • DMW-feat.-Davido-Yonda-Peruzzi-Fresh-VDM
  • https://koollifetv.com/wp-content/uploads/2018/04/feat-Davido-Yonda-Peruzzi-Fresh-VDM-603x330.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/04/DMW-AJE-feat.-Davido-Yonda-Peruzzi-Fresh-VDM-Koollifetv.com_.mp3
  • Aye
  • CDQ ft. Phyno, Reminisce
  • https://koollifetv.com/wp-content/uploads/2018/05/CDQ-Aye-official-Video-ft.-Phyno-Reminisce-1.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/05/CDQ-Aye-official-Video-ft.-Phyno-Reminisce-Koollifetv.com_-1.mp3
  • foreign
  • Simi ft Falz
  • https://koollifetv.com/wp-content/uploads/2018/05/video_simi__falz_-_foreign-6-1.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/05/Simi-Falz-Foreign-Koollifetv.com_.mp3
  • Ah-Blem-Blem
  • Timaya
  • https://koollifetv.com/wp-content/uploads/2018/04/ah-blem-blem-video-koollifetv.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/04/Timaya-Ah-Blem-Blem-Koollifetv.com_.mp3
  • Faut-pas-forcer
  • Safary
  • https://koollifetv.com/wp-content/uploads/2018/04/Safary-Faut-pas-forcer-Koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/04/Safary-Faut-pas-forcer-Koollifetv.com_.mp3
  • Whatchu-Doing-Tonight
  • Banky W
  • https://koollifetv.com/wp-content/uploads/2018/04/Screenshot-2018-4-10-Banky-W-feat-Susu-Whatchu-Doing-Tonight-Remix-OFFICIAL-VIDEO-YouTube2.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/04/Banky-W.-feat-Susu-Whatchu-Doing-Tonight-Remix-KOollifetv.com_.mp3
  • Zone
  • Viviane-chidid-feat-Barack-Adama
  • https://koollifetv.com/wp-content/uploads/2018/04/Viviane-chidid-feat-Barack-Adama-ZONE.jpg
  • Afro Music;Gambia Vibes
  • https://koollifetv.com/wp-content/uploads/2018/04/Viviane-chidid-feat-Barack-Adama-ZONE-Koollifetv.com_.mp3
  • IRE
  • Adekunle-Gold
  • https://koollifetv.com/wp-content/uploads/2018/02/adekunle-gold-ire.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/Adekunle-Gold-IRE-Koollifetv.com_.mp3
  • Upandan
  • Zoro Ft Mr Real
  • https://koollifetv.com/wp-content/uploads/2018/09/apala.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Zoro-Upandan-_koollifetv-com_mixdown.mp3
  • Pull Up
  • Reekado Banks
  • https://koollifetv.com/wp-content/uploads/2018/04/Reekado-banks-Pull-Up.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/04/Reekado-Banks-Pull-Up-Koollifetv.com_.mp3
  • Heya
  • Brymo
  • https://koollifetv.com/wp-content/uploads/2018/04/Brymo-heya.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/04/BRYMO-Heya-Koollifetv.com_.mp3
  • imagine
  • Soft
  • https://koollifetv.com/wp-content/uploads/2018/03/soft-imagine-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/Soft-Imagine-Koollifetv.com_.mp3
  • Work It
  • KoredebBello
  • https://koollifetv.com/wp-content/uploads/2018/04/Korede-Bello-Work-It.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/04/Korede-Bello-Work-It-Koollifetv.com_.mp3
  • One-Chance
  • Phyno
  • https://koollifetv.com/wp-content/uploads/2018/03/PHYNO-FINO.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/Phyno-One-Chance-Official-Audio-ft.-Kranium-Koollifetv.com_.mp3
  • ADA
  • DJ ECool feat Davido
  • https://koollifetv.com/wp-content/uploads/2018/01/DJ-Ecool-Ada-Artwork-koollifetv-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/DJ-ECool-feat-Davido-ADA-Official-Audio-Video-Koollifetv.com_.mp3
  • Vybe
  • Cuppy Ft Sarkodie
  • https://koollifetv.com/wp-content/uploads/2018/03/hawt-video-dj-cuppy-ft-sarkodie.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/Cuppy-Ft.-Sarkodie-Vybe-Koollifetv.com_.mp3
  • BELINDA
  • SEAN-TIZZLE
  • https://koollifetv.com/wp-content/uploads/2018/03/sizzle.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/SEAN-TIZZLE-BELINDA-koollifetv.com_.mp3
  • Comfortable
  • Demarco
  • https://koollifetv.com/wp-content/uploads/2018/03/Comfortable-Demarco-koollifetv.com-.jpg
  • Afro Music;Gambia Vibes
  • https://koollifetv.com/wp-content/uploads/2018/03/Demarco-Comfortable-Koollifetv.com_.mp3
  • Chop
  • Sugarboy--feat.-Ycee-
  • https://koollifetv.com/wp-content/uploads/2018/02/arrsu.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/Sugarboy-Chop-feat.-Ycee-Koollifetv.com_.mp3
  • Shempe
  • DJ-Xclusive-ft-Slimcase-MzKiss
  • https://koollifetv.com/wp-content/uploads/2018/03/DJ-Xclusive-Shempe-ft-Slimcase-MzKiss-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/DJ-XCLUSIVE-ft-SLIMCASE-x-MZKISS-SHEMPE.mp3
  • Rude Boy
  • Grey-C
  • https://koollifetv.com/wp-content/uploads/2018/03/Grey-C-Rude-Boy-koollifetv.com-.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/Grey-C-Rude-Boy-Official-Video-ft.-Patoranking-Koollifetv.com_.mp3
  • AFRICAN-BEAUTY
  • DIAMOND-PLATNUMZ-ft-OMARION
  • https://koollifetv.com/wp-content/uploads/2018/03/AFRICAN-BEAUTY-clean-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/DIAMOND-PLATNUMZ-ft-OMARION-African-Beauty-Koollifetv.com_.mp3
  • Hurt You
  • The Weeknd Feat Gesaffelstein
  • https://koollifetv.com/wp-content/uploads/2018/03/The-Weeknd-My-Dear-Melancholy.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/The-Weeknd-Hurt-You-feat.-Gesaffelstein-Official-Audio-Koollifetv.com_.mp3
  • One Kain
  • Simi
  • https://koollifetv.com/wp-content/uploads/2018/02/Simi-1.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/Simi-One-Kain-Koollifetv.com_.mp3
  • OPEN AND CLOSE
  • DR-SID
  • https://koollifetv.com/wp-content/uploads/2018/02/artworks-000295871589-jmwrsj-t500x500-500x431.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/DR-SID-OPEN-AND-CLOSE-Koollifetv.com_.mp3
  • Akwaaba
  • Mr-Eazi
  • https://koollifetv.com/wp-content/uploads/2018/03/Akwaaba-GuiltyBeatz.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/Akwaaba-GuiltyBeatz-x-Mr-Eazi-x-Patapaa-X-Pappy-Kojo-koollifetv.com_.mp3
  • No Do
  • Kiss Daniel
  • https://koollifetv.com/wp-content/uploads/2017/12/kiss-daniel-no-do4-740x431.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/KISS-DANIEL-NODO-Official-Audio.mp3
  • MANS-NOT-HOT
  • BIG-SHAQ
  • https://koollifetv.com/wp-content/uploads/2018/01/Big-Shaq-Mans-Not-Hot-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/BIG-SHAQ-MANS-NOT-HOT-AUDIO-MP3-VIDEO-koollifetv.com_.mp3
  • No one like you
  • Semah X Flavour
  • https://koollifetv.com/wp-content/uploads/2018/03/flavour-blind-boy.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/Semah-X-Flavour-No-One-Like-You-Koollife.com_.mp3
  • Whine-For-Daddy
  • Orezi-Ft-Tekno-
  • https://koollifetv.com/wp-content/uploads/2018/02/whine-For-Daddy-mp3-image-696x696.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/Orezi-Ft-Tekno-Whine-For-Daddy-Koollifetv.com_.mp3
  • Show-Me-Love
  • Praiz
  • https://koollifetv.com/wp-content/uploads/2017/12/Praiz-show-me-love.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Praiz-–-Show-Me-Love-–-Official-Audio-AfroMusic.mp3
  • Energy
  • Runtown
  • https://koollifetv.com/wp-content/uploads/2017/12/runtown-energy.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Runtown-Energy-koollifetv.com_-1.mp3
  • Olamide-Science-Student
  • Olamide-Science-Student
  • https://koollifetv.com/wp-content/uploads/2018/01/Science-Student-mp3-Olamide-–koollifetv.com_.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Olamide-Science-Student-MP3-Koollifetv.com_.mp3
  • My Way
  • P Square
  • https://koollifetv.com/wp-content/uploads/2018/02/my-way-video-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/Mr.-P-My-Way-Koollifetv.com_.mp3
  • Pour Me Water
  • Mr Eazi
  • https://koollifetv.com/wp-content/uploads/2017/12/mr-eazi.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Mr-Eazi-Pour-Me-Water-Official-Audio.mp3
  • Shepeteri
  • Idowest feat. Slimcase
  • https://koollifetv.com/wp-content/uploads/2018/02/Idowest-ft.-Slimcase-–-Shepeteri-740x354.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/Idowest-feat.-Slimcase-Shepeteri-koollifetv.com_.mp3
  • Flora-My-Flawa
  • Davido-
  • https://koollifetv.com/wp-content/uploads/2018/02/Screenshot_1-1.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/Davido-Flora-My-Flawa-koollifetv.com-Remix-2018.mp3
  • -Deep-Down
  • Dr-Sid
  • https://koollifetv.com/wp-content/uploads/2018/10/deep-down-dr-sid-koollifetv.com_.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/10/Dr-Sid-Deep-Down-Ft-Seyi-Shay_koollifetv-com_mixdown.mp3
  • Skelebe
  • SAMKLEF ft. Akon
  • https://koollifetv.com/wp-content/uploads/2018/02/akon.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/SAMKLEF-Skelebe-ft.-Akon-Koollifetv.com_.mp3
  • Love-U-Baby
  • Banky-W
  • https://koollifetv.com/wp-content/uploads/2018/02/Banky-W-Love-U-Baby-naijaexclusive-740x431.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/Banky-W-Love-U-Baby-koollifetv.com_.mp3
  • Mind
  • DMW ft. Davido, Peruzzi, Dremo & Mayorkun
  • https://koollifetv.com/wp-content/uploads/2018/02/dmw-mind-ft-davido-peruzzi-dremo-mayorkun-1-500x431.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/DMW-ft.-Davido-Peruzzi-Dremo-Mayorkun-–-Mind-koollifetv.com_.mp3
  • Very-Connected-
  • Fiokee-Feat.-Flavour
  • https://koollifetv.com/wp-content/uploads/2018/03/koollifetv.com_Fiokee_-_Very_Connected_Ft._Flavour-1519982891.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/Fiokee-Very-Connected-Feat.-Flavour-Koollifetv.com_.mp3
  • Somebody-Baby
  • Rudeboy-
  • https://koollifetv.com/wp-content/uploads/2018/02/rude-boy-psquare-2.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/Rudeboy-Somebody-Baby-Koollifetv.com_.mp3
  • Are You Down
  • Ladipoe-ft.-Tiwa-Savage
  • https://koollifetv.com/wp-content/uploads/2018/01/Ladipoe-ft.-Tiwa-Savage-Are-You-Down-Official-Music-Video.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Ladipoe-ft.-Tiwa-Savage-Are-You-Down-MP3-Koollifetv.com_.mp3
  • Complete-Me
  • Simi-
  • https://koollifetv.com/wp-content/uploads/2018/03/Simi.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/Simi-Complete-Me-Koollifetv.com_.mp3
  • Just Like That
  • Bracket ft. Korede Bello
  • https://koollifetv.com/wp-content/uploads/2018/01/Bracket-Just-Like-That-ft.-Korede-Bello-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Just-Like-That-Bracket-ft-Korede-koollifetv.com_.mp3
  • Gone Forever
  • Chidinma
  • https://koollifetv.com/wp-content/uploads/2018/03/Gone-Forever.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/Chidinma-Gone-Forever-Koollifetv.com_.mp3
  • All-We-Need-
  • Semah-G-Weifur-Feat.-Flavour
  • https://koollifetv.com/wp-content/uploads/2018/03/DJChoka-Music-36.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/Semah-G-Weifur-All-We-Need-Feat.-Flavour-Koollifetv.com_.mp3
  • -Shoulda-Official
  • Dbanj
  • https://koollifetv.com/wp-content/uploads/2018/02/Dbanj-Shoulda-Official-Video.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/Dbanj-Shoulda-Official-Video.jpg
  • CORRECT G
  • AYO JAY FT. DAVIDO & OLAMIDE
  • https://koollifetv.com/wp-content/uploads/2017/12/Ayo-Jay-ft.-Davido-Olamide-Correct-G.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Ayo-Jay-ft.-Davido-Olamide-Correct-G-1.mp3
  • the-way-you-are-gbadun-you
  • DiJa Ft Tiwa Savage
  • https://koollifetv.com/wp-content/uploads/2018/02/dija-ft-tiwa-savage-the-way-you-are-gbadun-you-www_naijaturnup_com-2018-01-30_08-33-01_397527.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/DiJa-Ft.-Tiwa-Savage-The-Way-You-Are-Gbadun-You-.mp3
  • Like Dat - Agogo (official Audio)
  • Davido
  • https://koollifetv.com/wp-content/uploads/2017/12/Davido-Like-Dat.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Davido-Like-Dat-Official-Audio.mp3
  • Get-It-Now-Remix
  • Tiwa-Savage-ft-Omarion
  • https://koollifetv.com/wp-content/uploads/2018/03/Tiwa-Savage-ft-Omarion-Get-It-Now-Remix-mp3.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/Tiwa-Savage-Get-It-Now-Remix-feat.-Omarion-Koollifetv.com_.mp3
  • FIA Official Audio
  • Davido
  • https://koollifetv.com/wp-content/uploads/2017/12/davido-koollife.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Davido-FIA-Official-Audio.mp3
  • Mirage
  • Alkaline
  • https://koollifetv.com/wp-content/uploads/2018/01/Mirage-By-Alkaline-Latest-of-Alkaline-2018.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Alkaline-Mirage-MP3-Koollifetv.com_.mp3
  • -Oyin
  • Niniola
  • https://koollifetv.com/wp-content/uploads/2018/02/Niyola.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/NINIOLA-OYIN-koollifetv.com_.mp3
  • Bawasaaba
  • Stonebwoy
  • https://koollifetv.com/wp-content/uploads/2018/01/stonebwoy-768x768.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Stonebwoy-Bawasaaba-MP3-Koollifetv.com_.mp3
  • Say-Bye-Bye
  • YCee-ft.-Eugy
  • https://koollifetv.com/wp-content/uploads/2018/03/Ycee-Say-Bye-Bye-ft-Eugy.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/03/YCee-Say-Bye-Bye-ft.-Eugy-Koollifetv.com_.mp3
  • Fire Fire
  • Rudeboy
  • https://koollifetv.com/wp-content/uploads/2018/01/fire-fire-mp3-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Rudeboy-Fire-Fire-Official-Audio-MP3koollifetv.com_.mp3
  • korede-bello-melanin-popping
  • korede-bello-melanin-popping
  • https://koollifetv.com/wp-content/uploads/2018/01/korede-bello-melanin-popping-off.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Korede-Bello-Melanin-Popping-Mp3-Official-Music-Video-koollifetv.com_.mp3
  • Over Dose | May D
  • May D
  • https://koollifetv.com/wp-content/uploads/2018/01/may-d-over-dose.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/May-D-Love-Overdose-koollifetv.com_.mp3
  • MANYA OFFICIAL AUDIO
  • WIZKID
  • https://koollifetv.com/wp-content/uploads/2017/12/Manya-art-360Baze.com_.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/WIZKID-MANYA-OFFICIAL-Audio-Afromusic-2017.mp3
  • Olingo
  • Ketchup
  • https://koollifetv.com/wp-content/uploads/2018/02/KetChup.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/Ketchup-Olingo-koollifetv.com_.mp3
  • Only One
  • Tekno
  • https://koollifetv.com/wp-content/uploads/2017/12/tekno-only-one-Koollifetv.com_.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Tekno-only-one-koollifetv.com_.mp3
  • TurKey
  • Wande-Coal
  • https://koollifetv.com/wp-content/uploads/2017/12/Wande-Coal-Tur-key-Nla-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Wande-Coal-Tur-Key-Nla-Official-AudioKoollifetv.com_.mp3
  • Heaven’s Gate
  • Burna Boy - (feat. Lily Allen)_Sekkle Down feat. J Hus
  • https://koollifetv.com/wp-content/uploads/2018/01/burna-boy-heaven.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Burna-Boy-Heaven’s-Gate-ft.-Lily-Allen-koollifetv.com_.mp3
  • Sugarcane
  • Tiwa Savage
  • https://koollifetv.com/wp-content/uploads/2017/12/tiwa-savage-sugarcane-ep-premiere-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Tiwa-Savage-Sugarcane-Official-Music-Audio-koollifetv.com-.mp3
  • Like
  • Reekado-Banks-Ft.-Tiwa-Savage-and-Fiokee
  • https://koollifetv.com/wp-content/uploads/2018/01/Reekado-Banks-Like-Ft.-Tiwa-Savage-and-Fiokee-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Reekado-Banks-Like-Ft.-Tiwa-Savage-and-Fiokee-Official-Music-Audio-Video-Koollifetv.com_.mp3
  • So Rire
  • Legendury Beatz feat.-Simi
  • https://koollifetv.com/wp-content/uploads/2018/01/Simi-So-rire-video-mp3-download-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Legendury-Beatz-So-Rire-feat.-Simi-MP3_koollifetv.com_.mp3
  • Cool It Down
  • Mr P
  • https://koollifetv.com/wp-content/uploads/2018/01/Mr-P-Cool-It-Down.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Mr.-P-Cool-It-Down_koollifetv.com_.mp3
  • Replay
  • Ice-Prince-prod by-Masterkraft
  • https://koollifetv.com/wp-content/uploads/2018/01/replay-video-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Ice-Prince-Replay-prod.-by-Masterkraft-_-Official-Music-Video-koollifetv.com_.mp3
  • Senrere-
  • Skales-–-Ft-D’banj
  • https://koollifetv.com/wp-content/uploads/2018/02/akon.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/02/Skales-–-Senrere-Ft-D’banj-Koollifetv.com_.mp3
  • Che Che
  • Mayorkun
  • https://koollifetv.com/wp-content/uploads/2017/12/Mayorkun-CheChe-photo-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Mayorkun-Che-Che-Official-Audio-Videokoollifetv.com_.mp3
  • Wo
  • Olamide
  • https://koollifetv.com/wp-content/uploads/2017/12/WhatsApp-Image-2017-08-07-at-2.21.49-AM-740x431.jpeg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Olamide-Wo-Official-Audio.mp3
  • Deja Vu
  • Burna Boy
  • https://koollifetv.com/wp-content/uploads/2017/12/Burna-Boy-Deja-Vu-Artwork.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Burna-Boy-Deja-Vu-Koollifetv.com_.mp3
  • Tekno GO
  • Tekno GO
  • https://koollifetv.com/wp-content/uploads/2017/12/howwebiz_aa26fa1496709a91d1325960f6803125_1501669272_cover.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Tekno-GO-Official-Audio-Afromusic-2017.mp3
  • Go-Down
  • Yemi-Alade
  • https://koollifetv.com/wp-content/uploads/2018/01/Yemi-Alade-Go-Down-picture-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Yemi-Alade-Go-Down-Official-MP3-Video-KOollifetv.com_.mp3
  • Get It
  • Tiwa Savage
  • https://koollifetv.com/wp-content/uploads/2017/12/tiwa-savage-sugarcane-ep-premiere-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Tiwa-Savage-Get-It-Now-koollifetv.com-.mp3
  • love you die
  • patoranking
  • https://koollifetv.com/wp-content/uploads/2017/12/patoranks-love-you-die-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Patoranking-Love-you-Die-Official-Audio-Video-ft.-Diamond-Platnumz-koollifetv.com_.mp3
  • Mama - Mayorkun
  • Mayorkun
  • https://koollifetv.com/wp-content/uploads/2017/12/Mayorkun-Mama-Official-MP3-Videokoollifetv.com_.mp3
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Mayorkun-Mama-Official-MP3-Videokoollifetv.com_.mp3
  • Bella y Sensual
  • Romeo-Santos-Daddy-Yankee
  • https://koollifetv.com/wp-content/uploads/2018/01/Koollife-Reupload.Still001.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Romeo-Santos-Daddy-Yankee-Nicky-Jam-Bella-y-Sensual-Official-Audio-VideoKoollifetv.com_.mp3
  • Single-Searching-feat.-Falz.mp3
  • Yemi Alade
  • https://koollifetv.com/wp-content/uploads/2017/12/yemi-alade-mama-afrique-ep.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Yemi-Alade-Single-Searching-feat.-Falz.mp3
  • KILODE
  • DJ-ECool-Feat. Dremo
  • https://koollifetv.com/wp-content/uploads/2018/01/DJ-ECool-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/DJ-ECool-Feat.-Dremo-KILODE-OFFICIAL-AUDIO-VIDEO-koollifetv.com_.mp3
  • For life
  • Runtown
  • https://koollifetv.com/wp-content/uploads/2017/12/Runtown-For-Life-Lyrics.jpeg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/For-Life-Official-Audio-Runtown-_-Afromusic-2017.mp3
  • Ma Lo
  • Tiwa-Savage Ft Wizkid Spellz
  • https://koollifetv.com/wp-content/uploads/2017/12/tiwa.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Tiwa-Savage-Ft-Wizkid-Spellz-Ma-Lo-Official-Audio-Afromusic-2017.mp3
  • Bambiala
  • Danagog-feat.-Davido
  • https://koollifetv.com/wp-content/uploads/2018/01/danagog-bambiala-artwork-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Danagog-Bambiala-feat.-Davido-_-Mayorkun-Official-Audio-Videokoollifetv.com_.mp3
  • BIA
  • Seyi-Shay
  • https://koollifetv.com/wp-content/uploads/2017/12/Seyi-Shay-BIA-koollifetv.com_.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Seyi-shay-bia_koollifetv.com-2.mp3
  • EL-CHAPO
  • DBanj-Ft-Gucci-Mane-And-Wande-Coal
  • https://koollifetv.com/wp-content/uploads/2017/12/DBanj-Ft-Gucci-Mane-And-Wande-Coal-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/DBanj-EL-CHAPO-ft.-Gucci-Mane-Wande-Coal-koollifetv.com_.mp3
  • Mama - Tekno
  • Tekno
  • https://koollifetv.com/wp-content/uploads/2017/12/Tekno-Mama-ft.-Wizkid-ART.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Tekno-Mama-Official-Audio-ft.-Wizkid-Afromusic-2017.mp3
  • Wizkid
  • https://koollifetv.com/wp-content/uploads/2016/09/jim-iyke.jpg
  • https://koollifetv.com/wp-content/uploads/2016/09/Wizkid-Sound-It-Prod.-Sarz-1.mp3
  • Credit Card
  • Dammy Krane
  • https://koollifetv.com/wp-content/uploads/2017/12/Dammy-krane-credit-card-360Baze.com_.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Dammy-Krane-Credit-Card-Master-Prod.-Dicey_360Baze.com_.mp3
  • OOO
  • Wizkid-x-Burna-Boy-x-Zingah-x-Maphorisa Prod By-Lunii-Skipz-
  • https://koollifetv.com/wp-content/uploads/2017/12/OOO-Prod.-By-Lunii-Skipz-Wizkid-x-Burna-Boy-x-Zingah-x-Maphorisa-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Wizkid-x-Burna-Boy-x-Zingah-x-Maphorisa-OOO-Prod.-By-Lunii-Skipz_koollifetv.com-.mp3
  • I-Dun-Care
  • Simi
  • https://koollifetv.com/wp-content/uploads/2018/09/maxresdefault-3.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Simi-I-Dun-Care-_koollifetv-com_mixdown.mp3
  • Father
  • MI-Your feat. DICE-AILES
  • https://koollifetv.com/wp-content/uploads/2018/01/MI-Your-Father-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/MI-ABAGA-YOUR-FATHER-feat.-DICE-AILES-_-OFFICIAL-MUSIC-MP3-VIDEO-koollifetv.com_.mp3
  • Obioma Remix
  • J-Martins Ft Flavour
  • https://koollifetv.com/wp-content/uploads/2018/01/J-Martins-Obioma-Remix-Artwork-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/J.Martins-Ft-Flavour-Obioma-Remix-koollifetv.com_.mp3
  • Pabanbari
  • 9ice
  • https://koollifetv.com/wp-content/uploads/2017/12/9ice-–-Pabanbari.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/9ice-Papanbari-Koollifetv.com_.mp3
  • Amadi-Aika
  • Nonso
  • https://koollifetv.com/wp-content/uploads/2017/12/Nonso-Amadi-Aika-Koollifetv.com_.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Nonso-Amadi-Aika_koollifetv.com_.mp3
  • All Over
  • Tiwa Savage
  • https://koollifetv.com/wp-content/uploads/2017/12/tiwa-savage-sugarcane-ep-premiere-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Tiwa-Savage-All-Over-koollifetv.com-.mp3
  • Hypocrite
  • Falz
  • https://koollifetv.com/wp-content/uploads/2019/04/maxresdefault-2-1.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2019/04/Falz-Hypocrite-ft.-Demmie-Vee.mp3
  • As-i-dey-go
  • Dbanj
  • https://koollifetv.com/wp-content/uploads/2017/12/As-i-dey-go-dbanj-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Dbanj-As-I-Dey-Go-Official-Audio-Video-koollifetv.com_.mp3
  • Isaka
  • Wande-Coal
  • https://koollifetv.com/wp-content/uploads/2017/12/Isaka-Wande-Coal-Koollifetv.com-.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Wande-Coal-DJ-Tunez-Iskaba-Official-Audio-VideoKoollifetv.com_.mp3
  • Telli-Person
  • Timaya
  • https://koollifetv.com/wp-content/uploads/2017/12/Timaya-Telli-Person.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Timaya-Telli-Person-Feat.-Phyno-_-Olamide-Official-Audio-VideoKoollifetv.com_.mp3
  • For-My-Head
  • Mr P
  • https://koollifetv.com/wp-content/uploads/2017/12/Mr.-P-For-My-Head-Artwork-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Mr.-P-For-My-Head-koollifetv.com_.mp3
  • Rayvanny
  • Makulusa_ft_DJ_Maphorisa_Dj_Buckz
  • https://koollifetv.com/wp-content/uploads/2017/12/Mukulusa-koollifetv.com_.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Rayvanny_-_Makulusa_ft_DJ_Maphorisa_Dj_Buckz_koollifetv..com_.mp3
  • Nkenji Keke
  • Rudeboy
  • https://koollifetv.com/wp-content/uploads/2018/01/Rudeboy-“Nkenji-Keke-koollifetv.com-.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Rudeboy-Nkenji-Keke-Official-Audio-VideoKoollifetv.com_.mp3
  • Hold Me Down
  • Tiwa-Savage
  • https://koollifetv.com/wp-content/uploads/2017/12/tiwa-savage-sugarcane-ep-premiere-koollifetv.com-.jpg
  • Afro Mixtape
  • https://koollifetv.com/wp-content/uploads/2017/12/Tiwa-Savage-Hold-Me-Down-koollifetv.com-.mp3
  • Me And You
  • Tiwa Savage
  • https://koollifetv.com/wp-content/uploads/2017/12/tiwa-savage-sugarcane-ep-premiere-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Tiwa-Savage-Me-And-You-koollifetv.com-.mp3
  • Davido IF Fuji Cover
  • Destiny Boy
  • https://koollifetv.com/wp-content/uploads/2017/12/fia-2.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Davido-IF-Fuji-Cover-by-Destiny-Boy.mp3
  • This Year
  • Small-Doctor
  • https://koollifetv.com/wp-content/uploads/2017/12/Small-Doctor-This-Year-Artwork-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/The-Year-Small-Doctor-koollifetv.com_.mp3
  • Gbadun you
  • DiJa FT Tiwa
  • https://koollifetv.com/wp-content/uploads/2017/12/DiJa-Gbadun-you-ft-tiwa..jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Dija-ft-tiwa-savage-gbadun-you_koollifetv.com-3.mp3
  • Oshe
  • DJ-Jimmy-Jatt -Ft-Wizkid
  • https://koollifetv.com/wp-content/uploads/2017/12/DJ-Jimmy-Jatt-–-Oshe-Ft.-Wizkid-koollifetv.com_..jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/DJ_Jimmy_Jatt_Oshe_Ft_Wizkid_koollifetv.com2-.mp3
  • Ijele
  • Flavour Ft Zoro
  • https://koollifetv.com/wp-content/uploads/2018/01/Flavour-Ijele-Ft-Zoro-koollifetv.com-.png
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Flavour-Ijele-Feat.-Zoro-Official-Audio-videokoollifetv.com-.mp3
  • Chimamanda
  • Flavour
  • https://koollifetv.com/wp-content/uploads/2018/01/Flavour-Chimamanda-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/01/Flavour-Chimamanda-Official-Audio-Videokoollifetv.com_.mp3
  • God of Miracle
  • Frank-Edwards
  • https://koollifetv.com/wp-content/uploads/2017/12/Frank-Edwards-God-of-Miracle-koollifetv.com_.jpg
  • Gospel
  • https://koollifetv.com/wp-content/uploads/2017/12/Frank_Edwards_-_God_Of_Miracle_koollifetv.com2_.mp3
  • Pray-for-me
  • Darey
  • https://koollifetv.com/wp-content/uploads/2017/12/Pray-for-me-Darey-koollifetv.com-.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Darey-Pray-For-Me-ft.-Soweto-Gospel-Choir-Official-Audio-VideoKoollifetv.com_.mp3
  • ma la nob
  • Lagu Adiouza
  • https://koollifetv.com/wp-content/uploads/2017/12/adi.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2017/12/Adiouza-Ma-la-nob-Official-Audio.mp3
  • Gambian-Dream
  • ST ft Jalimadi
  • https://koollifetv.com/wp-content/uploads/2016/09/St.jpg
  • Gambia Vibes
  • https://koollifetv.com/wp-content/uploads/2016/09/ST-Gambian-Dream-ft-Jalimadi-NNA.mp3
  • Jealousy
  • Kisean-X-Kelvin-Drayz-X-G-Faal-X-Lena-Bee
  • https://koollifetv.com/wp-content/uploads/2018/09/WhatsApp-Image-2018-09-22-at-11.17.44-AM.jpeg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/09/Jealousy_-Kisean-X-Kelvin-Drayz-X-G-Faal-X-Lena-Bee-_-koollifetv-com_mixdown.mp3
  • Wally Yallah Bahna
  • GEE
  • https://koollifetv.com/wp-content/uploads/2016/09/gee-koollifetv.png
  • Gambia Vibes
  • https://koollifetv.com/wp-content/uploads/2016/09/Gee-Ft-Wizkid-Wally-Yallah-Bahna-1.mp3
  • Boss Lady
  • Laady Quincy
  • https://koollifetv.com/wp-content/uploads/2016/09/IMG_1961.jpg
  • Gambia Vibes
  • https://koollifetv.com/wp-content/uploads/2016/09/Laady-Quincy-Boss-Lady.mp3
  • KoollifeTV Christmas ft New Year
  • Happy Merry Christmas and New Year Accepella
  • https://koollifetv.com/wp-content/uploads/2017/12/Merry_Christmas_and_Happy_New_Year_PNG_Clipart-29-e1514233987820.png
  • Gambia Vibes
  • https://koollifetv.com/wp-content/uploads/2017/12/We-wish-you-a-merry-christmas-koollifetv.com_-1.mp3
  • My Head
  • 2SEC - ft. Davido, Peruzzi
  • https://koollifetv.com/wp-content/uploads/2018/12/2Sec-x-Davido-x-Peruzzi-My-Head-Prod-Fresh-mp3-image-740x431.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/12/2SEC-My-Head-ft.-Davido-Peruzzi-koollifetv-com_mixdown.mp3
  • Bon Soir
  • Falz - ft. Olu Maintain
  • https://koollifetv.com/wp-content/uploads/2018/12/falz-bon-soir-ft-olu-maintain-700x700.jpg
  • Afro Music
  • https://koollifetv.com/wp-content/uploads/2018/12/Falz-Bon-Soir-Official-Audio-ft.-Olu-Maintain-koollifetv-com_mixdown.mp3
No HTML5 audio playback capabilities for this browser. Use Chrome Browser!